PLANGAS – RPBC

Customer: PETROBRAS / ENGINEERING / IEABAST / IERB

Objective: Execution of construction and electromechanical assembly services, with supply of goods and materials, tests, commissioning and guided operation of the Natural Gas Unit at the President Bernardes Refinery (UN-RPBC), in Cubatão/SP.

Duration: 1,247 days (concluded in April 2011)

Total Man Hours: 2,850,000

Main quantities

Metallic Pile 28,000 m
Excavation 24,600 m³
Structural Concrete 5,700 m³
Asphalt Paving 5,600 m²
Metallic Structure 250,000 Kg
Pipeline 350,000 Kg
Valves 2,550 units
Equipment 51 units
Instruments 1,490 units
Electrical Ducts 46,000 m
Power and control cables 208,000 m
Motors 56 units