Customer: PETROBRAS / ENGINEERING / IEABAST / IERB
Objective: Execution of construction and electromechanical assembly services, with supply of goods and materials, tests, commissioning and guided operation of the Natural Gas Unit at the President Bernardes Refinery (UN-RPBC), in Cubatão/SP.
Duration: 1,247 days (concluded in April 2011)
Total Man Hours: 2,850,000
Main quantities
Metallic Pile | 28,000 m |
Excavation | 24,600 m³ |
Structural Concrete | 5,700 m³ |
Asphalt Paving | 5,600 m² |
Metallic Structure | 250,000 Kg |
Pipeline | 350,000 Kg |
Valves | 2,550 units |
Equipment | 51 units |
Instruments | 1,490 units |
Electrical Ducts | 46,000 m |
Power and control cables | 208,000 m |
Motors | 56 units |