Customer: PETROBRAS / ENGINEERING / IECOMPERJ
Objective: Provision of services referring to the elaboration of the executive project, supply of equipment and materials, civil construction, electromechanical assembly and commissioning (preservation, conditioning, pre-operation, startup and guided operation) of the Firefighting System Unit, for the Rio de Janeiro Petrochemical Complex (COMPERJ).
Duration: 1342 days (concluded in January 2016)
Total Man Hours: 2,690,000
Main quantities:
Excavation | 72,600 m³ |
Structural Concrete | 8,100 m³ |
Metallic Structure | 250,000 Kg |
Pipeline | 4,457,000 Kg |
Valves | 2,150 un |
Tank Ø 53m | 720,000 Kg |
Electrical Ducts | 3,500 m |
Power and control cables | 52,300 m |
Pumps 900m³/h | 5 units |